New Kent Red Oak Hardwood Installation, Sand & Finish

3 1/4" solid red oak installed, sanded on site and sealed with Loba 2K Duo, from bare subfloor to finished floor in 5 days.

🛡️ Licensed & Insured⭐ 5.0 Rating🏠 Locally Owned
New Kent red oak hardwood installation in New Kent, VA
FreeOn-Site Estimates

How the job went

This New Kent home was ready for real hardwood. The homeowners chose 3 1/4" solid red oak, a classic strip width with warm grain that suits the area's traditional homes, and wanted it finished on site rather than prefinished. Site finishing lets us sand the whole floor flat after installation, so every board sits flush with the next and the finish forms one continuous protective layer, with none of the small beveled grooves that prefinished boards have. We handled everything start to finish: installation, sanding and finishing, in 5 days.

The Problem

Unfinished hardwood leaves no room for shortcuts. Raw boards always have slight height differences between them, so the floor has to be installed tight and flat, then sanded evenly across every room before any finish goes on. Rushing the sanding leaves scratches and chatter marks that the finish magnifies. The homeowners also wanted a durable, low-odor finish that would stand up to daily family life without the yellowing of old oil-based polyurethanes.

What We Did

We installed the 3 1/4" red oak over a subfloor we'd checked first, nailing each board tight and keeping the lines straight and even through every room. Once the boards had settled, we sanded the whole floor through finer and finer grits with dust-contained equipment until it was smooth and flat. We sealed it with Loba 2K Duo, a two-part waterborne finish that cures harder than standard one-part finishes, resists scuffs and stays clear instead of turning amber. From bare subfloor to the last coat took 5 days, and the homeowners now have a solid red oak floor that will last for decades.

Project Details

LocationNew Kent
ServiceInstallation / Sand & Finish
WoodRed Oak
Duration5 Working Days

Before and after

Drag to compare.

After: the finished red oak floor installation in a New Kent, VA homeBefore: the room before the red oak floor installation in a New Kent, VA homeBeforeAfter
New Kent red oak: boards going down, then sanded and sealed

The job, step by step

How this floor came together

  1. 1Checked the subfloor

    We made sure the base was flat and solid before any boards went down.

  2. 2Installed 3 1/4" red oak

    Each board was nailed tight, with straight, even lines through every room.

  3. 3Let the boards settle

    Raw boards always have slight height differences, so we gave them time before sanding.

  4. 4Sanded flat on site

    We sanded the whole floor through finer and finer grits with dust-contained equipment.

  5. 5Sealed with Loba 2K Duo

    A two-part waterborne finish that cures hard, resists scuffs and stays clear. Start to finish took 5 days.